Specifications
The boards are 125 mm wide Lacquered oak engineered wood flooring click system 10mm thickness with 7.5mm HDF backing and 2.5mm oak top the boards come in random lengths 300mm – 1200mm.
Pack size is 1.8 meter squared
Pack Weight 18 kg
Telephone: 0333 6000 250 / 07976 282 673
Telephone: 0333 6000 250 / 07976 282 673
Versailles panels are parquet squares that are kept together by what looks to be an interwoven mesh of wood strips the sized can be 600m x 600mm, 800mm x 800mm or 1000mm x 1000mm, They are pieces of oak that are bound to a multiply base all within a wood frame, as shown in the illustration below. It also comes in various types of grading please click here for more information about grading and what they are Grading Types.
The boards are 125 mm wide Lacquered oak engineered wood flooring click system 10mm thickness with 7.5mm HDF backing and 2.5mm oak top the boards come in random lengths 300mm – 1200mm.
Pack size is 1.8 meter squared
Pack Weight 18 kg
The grade of this board is D Rustic
Grade A (Prime) – Very few knots, more consistent in colour.
Grade B (Select) – Small knots allowed, more variation in colour.
Grade C (Character) – Larger and more frequent knots, more colour variation allowed.
Grade D (Rustic) – No limit to amount of knots or colour variation
Mixed Grade – A combination of the above grades.
Always follow the specific manufactures instructions when installing a wood floor. Instructions are usually enclosed within the wood floor packaging.
Wooden Subfloors
Engineered wood floors can be installed on to wooden subfloors using a floating system. A floating system is when the new wood flooring sits on top of an underlay that covers the existing subfloor and is not secured to the subfloor.
1 First make sure the subfloor is in good condition and is even.
2 Check if sound-proofing is required. This can be achieved using a sound-reducing underlay.
3 A tongue and groove engineered floor is installed using a pva adhesive. A click system engineered floor is knocked together without an adhesive.
Solid wood floors can not be used as a floating system and require full fixing to the subfloor. On a wood subfloor we recommend the use of a power nailer or porter nailer. On a concrete subfloor we recommend a flooring adhesive.
1 First make sure the subfloor is in good condition, any loose floor boards should first be secured. If you wish to run the new flooring in the same direction as the original floorboards a 6mm ply board may be required first.
2 Each plank of solid wood flooring should be secretly nailed. Each nail should be fired through the tongue of the board, at least three nails per board or however many is required to secure the board to the subfloor.
Concrete Subfloors
Engineered products can be installed on concrete floors the same way as on wooden subfloors (see above). The only addition is a Damp Proof Membrane (DPM) which should be laid first.
Damp Proof Membrane (DPM)
When installing a wooden floor, it is important to protect it against damp and moisture. This can be achieved with a DPM. Solid wood require a liquid DPM to be applied to the floor, while engineered wood requires a DPM sheet or suitable underlay.
Solid wood floors need to be fixed to a concrete subfloor. To achieve this the following should be carried out:
1 First make sure the subfloor is level, any uneveness should be levelled using a recommended screed or levelling compound.
2 A liquid DPM should be applied to the subfloor. The flooring can be installed using a recommended adhesive.
Engineered wooden floors can be installed and guaranteed over underfloor heating, however manufactures installation instructions must be followed to validate the guarantee.
We source our wood flooring from a number of different manufactures, therefore each board can have its own warranty which may vary between factories. We will be happy to give advice when choosing the right board for your job.
If you are fitting over underfloor heating, it is important that the engineered wood flooring is fixed tightly -so there are no gaps between the board and the underfloor heating.
If the underfloor heating is laid in a screed, then the wood flooring would be glued to the subfloor using an appropriate flooring adhesive.
A liquid damp proof membrane is always recommended over a new concrete subfloor.
If the underfloor heating is laid in between wooden joists, the product we recommend is a multiply 20 mm thick structural board, fitted using a port-o-nailer to the joists. Where the underfloor heating prevents the nail to go into the joist, a face-fix (tung tight) screw can be used to fix as near to the original fixing place as possible. This gives an even fixing of the wood flooring to the joists across the entire room.
Thinner boards can be laid over underfloor heating. We would recommend a multi-ply board as this can be stuck to the floor using a wood flooring glue or can sometimes be floated using a low tog underlay, depending on the manufactures warranty.
Solid wood floors are not guaranteed over underfloor heating.
Deliveries
All deliveries are made to the pavement only, the driver is unable to carry goods into the customer’s premises. Please advise us if the delivery address has restricted access or other parking issues.
The driver will unload the goods from the vehicle but it is the customer’s responsibility to ensure sufficient help is available when the delivery arrives.
All goods need to be checked before opening to ensure you have the correct wood that you ordered. We can only accept returns as unopened boxes. Please see our returns policy.
On occasions, the delivery may be made by a courier company, including (depending on the size of the order) a pallet service by a large lorry. You will be informed prior to delivery if this is the case.
Any outstanding balance for goods will be due before delivery, if payment is unable to be made, delivery will need to be arranged.
Deliveries are made between 8 am and 5 pm.
We will endeavor to give a time, however, when using couriers it may just be am or pm.
We make every effort to adhere to an agreed delivery date but can accept no liability for circumstances beyond our control.
Damage; as the delivery is by a third-party delivery company, any damage to the flooring must be pointed out the driver and written on the delivery docket when signing for the delivery, otherwise we can not claim from the courier and we with not be able to recompense you for the damage pack or packs.
Cookie | Duration | Description |
---|---|---|
_GRECAPTCHA | 5 months 27 days | This cookie is set by Google. In addition to certain standard Google cookies, reCAPTCHA sets a necessary cookie (_GRECAPTCHA) when executed for the purpose of providing its risk analysis. |
cookielawinfo-checkbox-advertisement | 1 year | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Advertisement". |
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |
Cookie | Duration | Description |
---|---|---|
_gat | 1 minute | This cookies is installed by Google Universal Analytics to throttle the request rate to limit the colllection of data on high traffic sites. |
Cookie | Duration | Description |
---|---|---|
_ga | 2 years | This cookie is installed by Google Analytics. The cookie is used to calculate visitor, session, campaign data and keep track of site usage for the site's analytics report. The cookies store information anonymously and assign a randomly generated number to identify unique visitors. |
_gid | 1 day | This cookie is installed by Google Analytics. The cookie is used to store information of how visitors use a website and helps in creating an analytics report of how the website is doing. The data collected including the number visitors, the source where they have come from, and the pages visted in an anonymous form. |